Print this page
Monday, 02 September 2019 00:13

Aborted Fetal Material Used in Vaccines and Medicines

Written by

Children of God for Life has provided the following science evidence which is recorded in the vaccine manufacturer package inserts, scientific publications and patents. This meticulously researched document explains the direct link to the abortions involved, the cell lines created and gives footnote links to the science documents which describe the work of the scientists who use aborted babies to create vaccines. As early as 1936, forced abortions were performed under the US “Model Eugenic Sterilization Law” of 1922 and used in polio research.

 

Albert Sabin:

“A new approach was made by the use of 3- to 4-months-old human embryos, obtained aseptically by Cesarean section…The brain and cord, the lungs, kidneys, liver, and spleen were stored in the refrigerator, fragments of these tissues being taken for the preparation of media at 3-day intervals.” 1

Drs. Thicke, Duncan, Rhodes:

“Human embryos of two and one-half to five months gestation were obtained from the gynaecological department of the Toronto General Hospital…No macerated specimens were used and in many of the embryos the heart was still beating at the time of receipt in the virus laboratory.” 2

Dr Enders, Weller, et al Nobel Prize for polio research:

“Embryos of between 12-18 weeks gestation have been utilized. Rarely tissues were obtained from stillborn fetuses, or from premature infants at autopsy…In the experiments 3 sorts of embryonic materials were used: elements of skin, connective tissue, muscle; intestinal tissue; brain tissue…Whenever possible the embryo was removed from the amniotic sac.., transferred to a sterile towel and kept at 5 C until dissected.”3

-----------------------------------------------------------------------------------

RA273: Rubella Virus used in Rubella and MMR vaccines4

  • R=Rubella, A=Abortion, 27=27th aborted baby, 3=3rd Tissue where virus was isolated
  • 6 weeks gestation; sex not recorded - Isolated from kidney by Dr. Stanley Plotkin -
  • 40 more elective abortions for rubella virus isolation by T.H. Chang,5 (67 total) *

 

WI-38: Wistar Institute, Specimen No. 38, 32nd Abortion6,7

  • Abortion performed in Sweden and shipped to Leonard Hayflick, Wistar Institute, Philadelphia
  • Lung tissue 3 months gestation female
  • Used to culture RA273 for rubella and MMR vaccines * * NOTE: 67 abortions to produce rubella virus plus 32 abortions to produce the cell line for cultivation means there was a total of at least 99 elective abortions to create the rubella vaccine alone.

 

WI-26: Wistar Institute, Specimen No. 26, 20th Abortion8

  • Abortion performed in Sweden and shipped to Leonard Hayflick, Wistar Institute, Philadelphia
  • 3 months gestation male
  • Lung Tissue
  • Used in recombinant DNA for Enbrel

 

WI-44: Wistar Institute, Specimen No. 44, 38th Abortion9

  • Abortion performed in Sweden and shipped to Leonard Hayflick, Wistar Institute, Philadelphia - 3 months gestation female
  • Lung tissue Dr Stanley Plotkin
  • open testimony on use of 76 aborted fetuses10

 

MRC-5: Medical Research Council, Abortion No. 511

  • Abortion performed in UK for “psychiatric reasons”
  • Lung Tissue, 14 weeks gestation male
  • Used in (some) Polio, Rabies, Chickenpox, Hepatitis-A, Zostavax for shingles vaccines

 

HEK-293: Human Embryonic Kidney, Specimen No. 29312

  • Abortion performed in Netherlands
  • Kidney Tissue; Gestation age not recorded
  • Used in drugs, Pulmozyme, Repro, Eloctate, rhFVI, Nuwiq and Ebola vaccines under development

 

IMR-90: Abortion in US; Coriell Cell Repository13

  • Designer cell line to replace WI-38 - 16 weeks gestation female
  • Lung Tissue

 

IMR-91: Abortion in US; Coriell Cell Repository14

  • Designer cell line to replace MRC-5
  • 12 weeks gestation male
  • Lung Tissue

 

Lambda. hE1: Abortion in US for “psychosocial indications”15

  • Second Trimester abortion
  • Liver Tissue
  • Used in drugs Procrit, Epoetin alfa, Epogen, Aranesp, Darbepoetin alfa

 

PER C6: Abortion in Netherlands, “mother wanted to get rid of the fetus, father unknown”16

  • 16 - 18 weeks gestation
  • Retinal tissue
  • Designed specifically for the pharmaceutical industry; Used in Ebola vaccines under development

 

WALVAX2: Abortion in China, 9th Abortion17

  • 3 months gestation female
  • Lung tissue
  • Designed specifically to replace depleting supply of WI-38 and MRC-5 

 

Footnotes:

1. Albert B Sabin, Peter K. Olitsky, Proceedings of the Society for Experimental Biology and medicine, Cultivation of Poliomyelitis Virus in vitro in human embryonic tissue. Proc Soc Exp Biol Med 1936, 34:357-359

2. Joan C. Thicke, Darline Duncan, William Wood, A. E. Franklin and A. J. Rhodes; Cultivation of Poliomyelitis Virus in Tissue Culture; Growth of the Lansing Strain in Human Embryonic Tissue, Canadian Journal of Medical Science, Vol. 30, pg 231-245

3. Thomas H. Weller, John F. Enders, Studies on the Cultivation of Poliomyelitis Viruses in Tissue Culture : I. The Propagation of Poliomyelitis Viruses in Suspended Cell Cultures of Various Human Tissue; Journal of Immunology 1952;69;645-671

4. Plotkin et al, Attenuation of RA 2713 Rubella Virus in WI-38 Human Diploid Cell, American Journal of Diseases of Children, Vol. 118, pp 178-179, August 1969

5. T. H. Chang et al., “Chromosome Studies of Human Cells Infected in Utero and In Vitro with Rubella Virus,” Proceedings of the Society for Experimental Biology and Medicine 122.1 (May 1966): 237–238

6. L. Hayflick and P.S. Moorhead, The Serial Cultivation of Human Diploid Cell Strains, Experimental Cell Research Vol 25, pp 585- 621, 1961

7.L. Hayflick, The Limited In Vitro Lifetime of Human Diploid Cell Strains, Experimental Cell Research, Vol 37, pp 614-636 1964

8. L. Hayflick, The Limited In Vitro Lifetime of Human Diploid Cell Strains, Experimental Cell Research, Vol 37, pp 614-636 1964

9. L. Hayflick, The Limited In Vitro Lifetime of Human Diploid Cell Strains, Experimental Cell Research, Vol 37, pp 614-636 1964

10. Plotkin et al, Cytological and Chromosomal Studies of Cell Strains from Aborted Human Fetuses, Exp Biology, Vol 122, 1966

11. Jacobs et al, Nature, Vol 227, pp 168 -170, 1970 Characteristics of a human diploid cell designated MRC-5.

 12. https://wayback.archive-it.org/7993/20170404095417/https://www.fda.gov/ohrms/dockets/ac/01/transcripts/3750t1_01.pdf

13. https://cogforlife.org/wp-content/uploads/2012/05/imr90CoriellFullReport.pdf

14. https://grants.nih.gov/grants/guide/notice-files/not93-196.html

15. http://www.ncbi.nlm.nih.gov/pmc/articles/PMC350439/pdf/pnas00499-0116.pdf

16. https://wayback.archive-it.org/7993/20170404095417/https://www.fda.gov/ohrms/dockets/ac/01/transcripts/3750t1_01.pdf

17. Walvax Biotechnology Co. Ltd.; Kunming, Yunnan, PR China Characteristics and viral propagation properties of a new human diploid cell line, walvax-2, and its suitability as a candidate cell substrate for vaccine production, Apr 2015

 

Debi Vinnedge

Debi Vinnedge is the Executive Director of Children of God for Life, a non-profit, pro-life organization focused on the bioethic issues of human cloning, embryonic and fetal tissue research. In addition she serves as a member of the Board at Sound Choice Pharmaceutical Institute and her organization is an official member of the American Life League Associates program.

Ms Vinnedge is a nationally recognized author and speaker and has provided written testimony for Congressional hearings on embryonic stem cell research. She introduced the Fair Labeling and Informed Consent Act to members of the US House and Senate, legislation that protects religious rights, moral conscience and requires informed consent on medical products using aborted fetal or embryonic materials.

Ms Vinnedge is considered the foremost authority on the use of aborted fetal cell lines in medical products and vaccines. Her organization’s Campaign for Ethical Vaccines has gained the backing of over 638,000 supporters nationwide including numerous medical professionals, pro-life organizations, religious and political groups.

https://cogforlife.org/

Latest from Debi Vinnedge

Related items